Pine Grove Road has been seeing increased wear and tear to the pavement resulting in a rough road surface with a high maintenance demand. The Pine Grove Road Reconstruction Project will be a full replacement of the existing pavement section from US 40 to Mount Werner Drive. The project goals also include construction of sidewalks, replacement of aging storm sewers and a pedestrian crossing linking the transit stops near Angels View Way. Project goals are to improve rideability and lifetime of Pine Grove Road Asphalt and to improve multi-modal transportation and connectivity and safety.
The city has partnered with KLJ Engineering for the design of the project. The design for the project is anticipated to be complete by July of 2024. Construction will begin in the summer of 2025 upon a selection of a contractor. The Project will be over completed over 2 construction seasons through two phases of construction. Phase 1 includes the area from US 40 to approximately Central Park Drive. Phase 2 from approximately Central Park Drive to Mount Werner Road. Phase 1 construction is planned for the summer of 2025 and Phase 2 is planned for the summer of 2026.
Pine Grove Road has been seeing increased wear and tear to the pavement resulting in a rough road surface with a high maintenance demand. The Pine Grove Road Reconstruction Project will be a full replacement of the existing pavement section from US 40 to Mount Werner Drive. The project goals also include construction of sidewalks, replacement of aging storm sewers and a pedestrian crossing linking the transit stops near Angels View Way. Project goals are to improve rideability and lifetime of Pine Grove Road Asphalt and to improve multi-modal transportation and connectivity and safety.
The city has partnered with KLJ Engineering for the design of the project. The design for the project is anticipated to be complete by July of 2024. Construction will begin in the summer of 2025 upon a selection of a contractor. The Project will be over completed over 2 construction seasons through two phases of construction. Phase 1 includes the area from US 40 to approximately Central Park Drive. Phase 2 from approximately Central Park Drive to Mount Werner Road. Phase 1 construction is planned for the summer of 2025 and Phase 2 is planned for the summer of 2026.
Share 60 Percent Plan Set for Pine Grove Road on FacebookShare 60 Percent Plan Set for Pine Grove Road on TwitterShare 60 Percent Plan Set for Pine Grove Road on LinkedinEmail 60 Percent Plan Set for Pine Grove Road link
View the 60% Design Plans for the Pine Grove Road Reconstruction.